- Proje Detayları
- İşveren:Aksa Kimya Sanayi A.Ş.
- Proje:Aksa Dope Project
- Yer:Yalova/Turkey
- Sektör:Chemical Plant
- Yıl:2020
- Kapsam:
- Line List, Tie-In List
- Plot Plan Preparation
- Piping Design, Layout & Isometric Preparation
- Pipe Stress Analysis
- 3D Model of Equipment, Trays, Piping, Structures
- Structural & Concrete Design & Engineering
- Laser Scanning and Asbuilt Model
- Total Line Quantity : 780 ea.
- Total Isometric Quantity: 1550 ea.
- Total Design & Engineering Man Hour : 13.500h
Aksa Dope Project
